445 A.2d 851
Commonwealth Court of Pennsylvania.Argued: September 14, 1981
May 26, 1982.
Utilities — Bridges — Rehabilitation costs — Scope of appellate review — Public Utility Code, 66 Pa. C.S. §§ 703(g) and 2704(a) — Prior order — Highway-rail crossings — Jurisdiction — Apportionment of costs.
1. In a utilities case involving the apportionment of bridge rehabilitation costs, the review by the Commonwealth Court of Pennsylvania of the decision of the Public Utility Commission must be limited to determining whether constitutional rights were violated or an error of law committed or whether the Commission’s findings are supported by substantial evidence. [612]
Page 610
2. Section 703(g) of the Public Utility Code, 66 Pa. C. S. § 703 (g), does not require that new evidence be presented to the Public Utility Commission before it may rescind or amend a prior order. [613]
3. Because the Public Utility Commission has exclusive jurisdiction over highway-rail crossings, and because the factual issue of what portion of a bridge constitutes a crossing approach must turn on the particular circumstances of each case and is not easily susceptible of a mere linear analysis, the Public Utility Commission can order repair of an entire bridge and allocate costs in any manner that is reasonable. [614]
4. Section 2704(a) of the Public Utility Code, 66 Pa. C. S. § 2704 (a), does not require that the Public Utility Commission establish that its apportionment of costs for bridge repair is related to the safety and welfare of the public. [614]
President Judge CRUMLISH filed a concurring and dissenting opinion, which was substantially as follows:
1. The Public Utility Commission cannot allocate the expenditure of a maintenance item, such as the painting of a bridge, unless it determines that the cost is related to public safety and accident prevention. [616-17]
Argued: September 14, 1981, before President Judge CRUMLISH and Judges BLATT and MacPHAIL, sitting as a panel of three.
Appeals, Nos. 2426 C.D. 1980 and 2456 C.D. 1980, from the Order of the Pennsylvania Public Utility Commission in the case of Investigation upon the Commission’s own motion into the matters relating to the structural adequacy and load-carrying capacity of the bridge carrying State Highway Route No. 26191 over and above the grade of tracks of the Pittsburgh and Lake Erie Railroad Company in the Township of Perry, Fayette County, as pertains to the proper service, accommodation, convenience and safety of the travelling public utilizing same, No. I-77110278.
Bridge rehabilitation costs imposed upon petitioners by the Pennsylvania Public Utility Commission. Petitioners filed exceptions. Exceptions denied. Petitioners
Page 611
appealed to the Commonwealth Court of Pennsylvania. Held: Affirmed.
Richard A. Porach, for petitioner, The Pittsburgh Lake Erie Railroad Company.
Philip T. Warman, for petitioner, County of Fayette.
John J. Gallagher, Assistant Counsel, with him Alfred N. Lowenstein, Deputy Chief Counsel, and Joseph J. Malatesta, Jr.,
Chief Counsel, for respondent.
George D. Wenick, Associate Counsel, with him Jordan S. Weltman, Eckert, Seamans, Cherin and Mellott, for intervenors.
OPINION BY JUDGE BLATT, May 26, 1982:
The Pittsburgh Lake Erie Railroad Company (PLE) and the County of Fayette (Fayette) have separately appealed a Public Utility Commission (PUC) final order imposing certain bridge rehabilitation costs upon them. We affirm[1] the PUC order in each case.
Layton Bridge, in Perry Township, Fayette County, carries State Highway Route 26191 over PLE’s single track right-of-way and the Youghiogheny River, and the Pennsylvania Department of Transportation (DOT) has maintained the bridge under legislative mandate[2] and a 1969 PUC order. Because of the deterioration of the bridge’s wooden deck, the PUC
Page 612
directed an immediate weight limit reduction and instituted a further investigation. It then ordered DOT to prepare plans and cost estimates for the construction of a new wooden deck, at an estimated project cost of $489,934,[3] of which $26,322 was attributable to the rehabilitation of that part of the bridge which spanned the railroad tracks. The PUC directed DOT initially to perform all rehabilitative work and it also ordered PLE, upon completion, to reimburse DOT for 50% of the actual cost attributable to the rehabilitation of the railroad span. The PUC order likewise directed Fayette to reimburse DOT for 10% of the total cost of repairing the bridge.
In its appeal, PLE argues that a 1969 order of the PUC which gave DOT responsibility for maintaining the bridge cannot now be altered to allocate a portion of the rehabilitative costs to another party without a showing of a change in conditions or circumstances.
Our review must be limited, of course, to determining whether or not constitutional rights have been violated, an error of law has been committed, or the Commission’s findings and order are supported by substantial evidence. Fairview Water Co. v. Pennsylvania Public Utility Commission, 55 Pa. Commw. 96, 422 A.2d 1209 (1980).
Page 613
Section 2702(b) of the Public Utility Code (Code), 66 Pa. C. S. § 2702(b), vests the Commission with the exclusive power to determine and prescribe, by regulation or order, the manner in which highway-rail crossings may be constructed, altered, relocated, suspended or abolished, and the manner and conditions in or under which such crossings shall be maintained, operated and protected to effectuate the prevention of accidents and the promotion of public safety. Section 2702(c) of the Code, 66 Pa. C. S. § 2702(c), empowers the Commission to order any public utility or municipal corporation concerned or the Commonwealth to perform this work, and under Section 2704 (a), 66 Pa. C. S. § 2704(a), the PUC may allocate costs among these parties.
In addition, the PUC has the authority under Section 703(g), 66 Pa. C. S. § 703(g), “at any time, after notice and after opportunity to be heard . . . [to] rescind or amend any order made by it.” The statute does not require that new evidence be presented before the PUC may rescind or amend a prior order Tranter v. Public Utility Commission, 4 Pa. Commw. 585, 288 A.2d 837 (1972).[4] PLE mistakenly relies here on Scott Township v. Pennsylvania Public Utility Commission, 188 Pa. Super. 174, 146 A.2d 617 (1958), because the court there clearly did not mandate that evidence of changed conditions is necessary to justify a reallocation of maintenance responsibility. Further, PLE’s claim contradicts the unambiguous wording of Section 703(g) which requires only notice and an opportunity to be heard, which were both clearly provided here.
Page 614
In its appeal, Fayette contends that it should not bear a percentage of the cost of the entire bridge repair plan because only a single span traverses PLE’s track.[5] The PUC counters that it has exclusive jurisdiction over highway-rail crossings supra note 2, as well as the approaches to those crossings Springettsbury v. Public Utility Commission, 5 Pa. Commw. 102, 289 A.2d 762 (1972), that in this case the portion of the bridge not actually traversing PLE’s tracks is a crossing approach and that it is therefore properly within the PUC’s jurisdiction.
The factual issue of the extent of an approach must turn on the particular circumstances of each case and a mere linear analysis is not controlling, Springettsbury, because the portions of a structure carrying traffic over a river cannot be separated from the portion carrying traffic over railroad tracks. Conshohocken Borough v. Pennsylvania Public Utility Commission, 135 Pa. Super. 295, 5 A.2d 590 (1939). We conclude, therefore, that the PUC can order the entire structure’s repair and allocate costs accordingly, and we also conclude that the order requiring Fayette’s 10% contribution is reasonable.
Moreover, we are not persuaded by the petitioners’ argument that the provisions of Section 2702(b) of the Code, 66 Pa. C. S. § 2702(b), require the PUC to allocate only those costs of maintenance directly related to an immediate danger to the safety and welfare of the public and that, because the painting of the bridge is not related to public safety, the cost thereof may not be allocated.[6]
Page 615
The PUC’s authority to allocate costs is provided in Section 2704(a) of the Code, 66 Pa. C. S. § 2704(a), which states that “the cost of construction, relocation, alteration, protection, or abolition of such crossing . . . shall be borne and paid . . . by the public utilities or municipal corporations concerned, or by the Commonwealth, in such proper proportions as the commission may, after due notice and hearing, determine. . . .” This section clearly does not require the PUC to establish that its apportionment of costs was related to the safety and welfare of the public.[7]
We must conclude, therefore, that, absent a showing that the PUC has otherwise abused its discretion, its assignment of costs in this case was proper.
ORDER
AND NOW, this 26th day of May, 1982, the Pennsylvania Public Utility Commission’s order, I-77110287 adopted August 21, 1980 and entered September 24, 1980, is hereby affirmed.
Judge MENCER did not participate in the decision in this case.
Judge PALLADINO did not participate in the decision in this case.
formerly 66 P. S. § 1181(a), repealed by the Act of July 1, 1978, P.L. 598. A similar provision is now found in 66 Pa. C. S. § 2704(a)).
CONCURRING AND DISSENTING OPINION BY PRESIDENT JUDGE CRUMLISH, JR.
I concur that the Public Utility Code does not require the Commission to consider evidence of changed
Page 616
conditions before rescinding or amending a prior order. I also agree that it is authorized to order the entire structure’s repair and to allocate costs accordingly. I am convinced, however, that the Commission erred by ordering the Pittsburgh and Lake Erie Railroad and Fayette County to contribute to the structure’s painting costs.
The Public Utility Commission, a statutory creature, has only those powers clearly conferred upon it by the Legislature See Allegheny County Port Authority v. PUC, 427 Pa. 562, 567, 237 A.2d 602, 605 (1967). There is no explicit statutory wording delineated, nor the strong and necessary implication therefrom, which would permit the PUC to allocate painting costs in this case. Code Section 2702(b)[1] provides, in part, that:
The Commission is hereby vested with exclusive power to . . . determine and prescribe by . . . order . . . the manner in which such crossings may be constructed, altered, relocated, suspended or abolished, and the manner and conditions in or under which such crossings shall be maintained, operated, and protected to effectuate the prevention of accidents and the promotion of the safety of the public. (Emphasis added.)
The Commission’s power to regulate maintenance is clearly qualified and explicitly limited to effectuating the prevention of accidents and the promotion of public safety. Since Section 2704(a) of the Code[2] does not authorize the PUC to allocat maintenance costs, any regulation of maintenance responsibility is
Page 617
subject to the limitations of Section 2702(b).[3] The Pennsylvania Department of Transportation concedes that the painting of the Layton Bridge is a maintenance item.[4] It follows then that the Commission cannot allocate this expenditure unless it determines that the cost is related to public safety and accident prevention.
It is my understanding that the payment of maintenance costs is clearly a condition which, under Section 2702(b), must be related to public safety promotion and accident prevention. Thus, I would reverse that part of the PUC’s order which requires the Railroad and the County to contribute to the painting expenditure because the record is completely devoid of a PUC determination that the painting is necessary “to effectuate the prevention of accidents and the promotion of the safety of the public.”[5] The painting costs should be borne exclusively by the Commonwealth as provided by Section 701 of the State Highway
Page 618
Law,[6] which requires the Commonwealth to maintain bridges on State highways, with certain exceptions not here applicable.